- 25+
Years experience in process control and IT department. Management of Legal
Practice's information systems and network infrastructure, management of
3rd party service providers to meet SLAs. Manage team of 3 people.
- Experience
of costing, proposal preparation, bid evaluation, feasibility studies,
functional design and all aspects of project life cycle.
- Project
Leadership of small to medium sized projects varying from medium to
long-term and fast track timescales. Project values in excess of £1
million and project staff sizes of up to 14 staff.
- Computer
control systems for process plant, mechanical handling plant, nuclear
control and monitoring systems.
Experienced
in Novell NetWare, Microsoft NT and Microsoft products in the modern office and
engineering design environment to second line support level. Experience in
W2000 and Citrix Metaframe XPa FR2 (3 years)
TRAINING
- Windows
2000 Server Administration Overview ( external training company)
- Windows
2000 Professional Deployment ( external training company
- NT4
Server and Workstation (external training company)
- Fundamentals
of SMS (external training company)
- Fundamentals
of Documentum (Documentum Inc)
- Administration
of Videss Legal Office V9.1
- Citrix
Metaframe XPa Fr2 Administration
- FAST
Approved Software Auditor
- FAST
Approved Software Manager
SUMMARY OF
HARDWARE AND SOFTWARE EXPERIENCE
- IBM
compatible PC's
- Servers
- DEC VAX,
pdp11
- Allen
Bradley PLCs
- Siemens
PLCs
- ABB
distributed control systems
- Ferranti
Argus 700 series
- NT 4.0
Server/Workstation
- Windows
95/98/2000
- Novell
NetWare 3.x
- Videss
Legal Office V 8, V 9.0 to V 9.2
- SETCON
scada package
- Cascade
scada
- Controlview
scada
- Documentum
- Support
for Microsoft Office products ( Access, Excel, Word, PowerPoint) + MSMail
+ MSSchedule+ MSProject ( v3.0 and v4.0)+ Outlook 97/98/2000
- Support
for Novell network ( 200 users )
- Support
for WordPerfect 5.0 (dos),for windows (v5.1,5.2) First line
- Support
for Internet users (Internet Explorer all versions)
- Support
for ACAD (12,13,14) First line
EXPERIENCE
DETAIL at RUSSELL & RUSSELL SOLICITORS
- June
2000 - to date Awarded position of IT Manager reporting directly to the
Senior Partners, after a personal recommendation.
- Manage
the provision of information systems for 8 office locations duties include
management of all IT related contracts, negotiation evaluation and
procurement of hardware and software for the whole Practice.
- Ongoing
projects include identification of document and case management solutions,
feasibility studies for the introduction of web presence B to B solutions
and client access to secure industry specific database systems.
- Project
management and control of the opening of 4 new offices including
installation of inter and intra office telecoms, structured voice and date
cabling, new servers and transfer of users from two other locations with
the minimum disruption to the day to day business of the offices involved.
- First
successful implementation of the upgrade of Legal Software.
- Manage
team of 3 people.
- Planned
and managed installation of Citrix server system across the whole
practice, upgrade of data comms between branches
- Managed
installation of Avaya IP 30 ip telephone systems over 3 branches.
Major
upgrades to servers, decommissioning of remaining W98 pcs, installation of new
legal practice case management system based around MS office 2003, MS exchange
and SQL server
EXPERIENCE
DETAIL at KVAERNER E&C
- June
1997 - June 2000 Returned to IT department (see below) including home
office NT implementation and rollout co-ordinator for 200 staff and 3
sites managing install team of 3 others and ensuring timely and accurate
transfer from WINDOWS 3.1 and NOVELL 3 to NT4 SERVER/WORKSTATIONS and
NOVELL file servers. Co-ordination with two other company sites in South
of England. Northern England (Warrington, Ulverston, Teesside) second line
technical support for DOCUMENTUM 3.1.
- March
1997 - June 1997 Validation of third party custom designed control and
data handling package for a pharmaceutical pilot plant written in C and
Dbase IV.
- April
1996 - March 1997 Transferred to IT department of KJB as Senior Analyst
supporting a 200+ user base in-house and on upto 5 remote sites. NOVELL
NETWARE user front-end Windows 3.11. In depth First and second line
support knowledge of all common MICROSOFT OFFICE and project management
packages plus various packages essential to an engineering company.
- Nov.
1995 - March 1996 Lead Engineer - front end study for pharmaceutical plant
product enhancement and refurbishment for a large pharmaceutical company.
Involved in examining feasibility of several different solutions and specification
of process in S88 terms.
- Sept.
1995 - Nov. 1995 Commissioning Engineer - Precommissioning of a batch
polymer plant for a UK supplier.
- April
1995 - Aug. 1995 Lead Engineer - Systems Control Group Design of control
system software for a vitamin drying and packing plant for large
pharmaceutical company. Control system based on ABB distributed control
system
- Jan 1995
- April 1995 Lead Engineer - Systems Control Group Consultancy and testing
of a batch control system based on ABB distributed control system for a
large pharmaceutical company
- Nov.
1994 - Jan 1995 Lead Engineer - Systems Control Group Development of a
Standard Requirements and Functional Specification for a large
Pharmaceutical Company. Requested by name by the companies Chief
Engineer.
- May 1993
- July 1994 Lead Engineer - Systems Control Group Front End Study and
Requirement Specifications. Design and implementation of an ALLEN BRADLEY
and CONTROLVIEW Control System for a continuous and batch polymer
production plant.
- 1993 -
April 1993 Lead Engineer - Systems Control Group Front End Study and
Requirement Specifications for a water additives batch process plant
refurbishment and upgrade to DCS control system based on FISHER PROVOX.
- Mid 1992
- End 1992 Lead Engineer - Systems Control Group Production of Functional
Specification for a continuous and batch Glucose Production plant
refurbishment project based around FOXBORO SYSTEM 50 DCS System.
1991 -Mid
1992 Senior Systems Engineer Support for in-house PC Network based on Novell
Network, Software support implementation of in-house Network requirements for
engineering groups. Systems Control Group Quality Procedures update. Validation
of software and software support.
EXPERIENCE
DETAIL at SD-SCICON
- 1988 -
1990 Johnson Matthey CSD (Bruxelles) Project Leader - Auto catalyst
process system and management information system using SETCON and ORACLE.
Major aspects were SPC, continuous control and batch control via 200+
sequences. Was offered a permanent position by the company but turned
it down as I didn’t want to move abroad at that time.
- 1987 -
1988 Proctor & Gamble Project Leader Continuous Liquid Process control
system using SETCON and Allen Bradley PLC5. Major aspects were SPC, ladder
logic, algorithms for monitoring of process.
- 1985 -
1987 Nuclear Fuel Handling Systems Project Leader - Mechanical handling
systems for receiving of spent nuclear fuel into pond storage and transfer
of fuel rods into and out of process areas.
- 1984 -
1985 Nuclear Fuel Handling Systems Team Leader mechanical handling systems
for the receipt of spent nuclear rods from external areas and transfer to
internal storage containers. Mechanical handling systems for the removal
of spent nuclear rods from protective casings and transfer to storage
medium.
- 1980 -
1983 International Paints Polymer Plant Programmer/Team Leader Large
capacity batch process control system for the production of polymers for
external paints. 18 months on- site commissioning and support.
- 1978 -
1980 Ferranti Warehouse System Junior Programmer Control of large raw
materials warehouse to supply a large tyre factory.